Client had a pinhole leak in plumbing under the kitchen sink that went unnoticed and caused heavy damage to the wall and subfloor. DEM-LIV cleaned it up, tore it out, and rebuilt: new subfloor, new insulation, new drywall, fixed electrical issues, replaced outside door trim and baseboards, new floor, new paint — basically everything then finished the kitchen.
Finished scope:
New floors
• New granite countertops
Cabinets painted by the client
New hardware
• New plumbing
• New dishwasher
• New microwave / range hood exhausted to the outside
IMPORTANT please note:
Backsplash tile is not installed yet (these after photos show the real unfinished wall).
Window covering will be replaced with a black one.